OK75

HALF HITCH ASSISTANCE

Compared to earlier knotters, our knotter is easy to use, even when you are finishing you knot off with half hitches.
Knot tying made easy!! You may also use our knotter when finishing off other knots that involves using half hitches such as PR and midknots.

ハーフヒッチアシスト

Assits in tying FG knots

By attaching a clip to the OK75 in the designed location, you may safely attach the knotter to the foot of your line guide, the revit on your rods handle or an anchoring hole located on your boat. This will assit you in tying the FG knot!!

Assits in tying QE knots

This knotter was designed for light weight PE lines.
You can now tye-up your line system with our original (QE Knot).

RING HOOK

You may hold both welded rings as well as bearing swivels with the attached ring hook.This will assit you in tying half hitches to your leader line.

リングフック

LARGE-SIZED TENSION RUBBER

This tension rubber rings, makes it easy to tye off line and to not have to worry about your line slipping during the tying process.

大型テンションラバー
to PagrTOP

SPEC

Product name Color Line Capacity
(Line specs were rated
with japanese branded PE line)
Weight Price
(Japanese Yen)
OCEAN KNOTER OK75 NB/SR/SS/SO/P MAIN LINE:PE #0.8-3
LEADER:8-50lb
31g 5,700
to PagrTOP

COLOR

to PagrTOP

PARTS NAME

 


This knotter will assit in creating a strong line system. But just like anything practice makes perfect.
*
We also produced a movie to show you the most easiest way to use our knotter,
please watch this demostration while practicing.
* Recommended knots for different diameter lines.
For PE lines between the numbers of 0.8 and 1.5 we recommend using the QE knot.
=The no name knot keeps original line strength at over 80%. Much higher than other knots.
For PE lines over 1.5 we recommend using the FG knot.
=The FG knot retains 100% percent of the tensile strength of the line you are using.

To watch this movie please download the WMV file.
It is located on the right side of your monitor.
Please download using the following directions.
(1) Please right click on the picture and save to file.
(2) When the window appears,please check the file name and save.
(3) When the download finishes,please open the file and watch our demo movie.

FG Knot

  1. 1. How to set PE line
    1. (1) Please hang up your OK75 using a climbing hook.
    2. (2) Run the end of your PE line through the line holders.
    3. (3) Please tighten the tightning screw.
    4. (4) Wrapping your main line 3-4 times through the tension rubber and securely fasting each wrap using the O-Rings.

  2. 2. How to wrap your line
    1. (1) Holding the excess line between your thumb and index finger of your left hand.
    2. (2) Run your leaderline through the middle of the excess line. (running it through the right side).Pulling the leaderline down,
    3. (3) Then run the leader line back through the middle(from the leftside). Following the same step as (2).
    4. (4) Wrap the leader 6 times in both the right and left directions.

  3. 3. Temporary Holding
    1. (1) Then open the tightening screw and remove the PE end first.
    2. (2) Then use a half hitch to connect PE line and leader.

  4. 4. How to finish off your knot
    1. (1) Holding the OK75 with your left hand and your leader and PE line with your right, please tighten the line thats wrapped.
    2. (2) Please tighten your knot until the color changes. If knot is done incorrectly, it will fall apart at this step of tying.

to PagrTOP

QE Knots

  1. 1. How to set PE line
    1. (1) Wrapping your main line 3-4 times through the tension rubber and securely.
    2. (2) Finally, please use the two outside rings to pinch off your line. This will keep your line firmly inplace

    ※While using our knotter, injury might occur if line is not firmly secured.
    Depending on line diameter, you may want to add or subtract the number of times you wrap your line on your OK75.

  2. 2. How to wrap your line
    1. (1) Please place your pe line and leaderline parallel to each other and pinch them approx 20cm from your OK55.
    2. (2) Please wrap your pe line around your leaderline approx 10 times using your OK55.(Spinning it backwards)
    3. (3) Gently remove your line from the knotter,without undoing the twist you have created.

    ※The OK55 should be free from your line. Please be careful not to drop it.

  3. 3. UNI KNOT

    Please use a uni knot to close off your line system.

  4. 4. How to finish off your knot

    Please by holding your leaderline with your right hand and the two PE lines with your left, pull the two ends firmly your knot should tighten.

to PagrTOP

END Knots

  1. 1. How to position your leader line
    1. (1) Please position your leader line between line holders A and B as in the illustration.
    2. (2) Keeping your knot as close to the line holder as possible.

  2. 2. Pulling the leader line
    1. (1) By following the directions, pull the leader through the line holders A and B.
    2. (2) Placing the leader line on the pulley ,pull until your line is tightly secured between line holders A and B.
    3. (3) Please tighten the tightning screw.

  3. 3. PE line positioning
    1. (1) Please tighten the tightning screw.
    2. (2) After wrapping PE line around the tension rubber, place PE line through the 2 rubber rings located on the outside.

  4. 4. Half hitch 1

    Using a half hitch to secure mainline and leader.
    (6times)

  5. 5. Half hitch 2

    This times purpose is to protect your main line from the cut end of your leader line. (6times)

  6. 6. Perfect finish
    1. (1) Please cut the ends of both PE and leader lines close to the knot.
    2. (2) Please remove line from the ocean knotter.

to PagrTOP

Branding the Leader

  1. 1. Temporary Holding
    1. (1) Run your line through the welded ring.
    2. (2) Run leaderline in the same direction through the ring as with your main line and create a loop.
    3. (3) Placing the loop in the opposite direction of your mainline, please run your leader end through the loop.
    4. (4)Tighten up the knot.
    5. (5) Tye one half hitch.
    6. (6) Place the welded ring on the hook.

  2. 2. How to position your leader line
    1. (1) By following the directions, pull the leader through the line holders A and B.
    2. (2) Placing the leader line on the pulley,pull until your line is tightly secured between line holders A and B.
    3. (3) Please tighten the tightning screw.

  3. 3. Half hitch

    Using a half hitch to leader. (5 times)

  4. 4. Perfect finish
    1. (1) Please cut the ends of leader lines close to the knot.
    2. (2) Please remove line from the ocean knotter.

to PagrTOP
CLOSE